Paths include of ABFA path and two evaluated optimum path compared and indicated that two optimum paths overlapped mostly. ![]() Then the mentioned co-parameters data layer loaded in GIS environment and after allocation the special coefficient and value for weighting parameters and combine them based on MCE method and the cost map made based on AHP method which Lead to determination of optimum path by using LCPA method. by using base map and extraction of expected points geometrical location from Google Earth, position land surveying done. In this point of view from Taleghan’s dam to Hashtgerd New City case study, we need to distinguish and apply the essential parameters such as topographic and morphologic conditions, environmental issues by consideration on sustainable development, population distribution patterns, roads and etc. Weighting, Water Pipeline, Taleghan Dam, Hashtgerd New City, Analytical Hierarchy Process, Optimum PathĪBSTRACT: These instructions give you guidelines for preparing determination of optimum path by considering technical and engineering, environment and cost management visions. Cartographica, 3, 37-51.Īpplication and Comparison of Analytical Hierarchy Process (AHP) and Network Methods in Path Finding of Pipeline Water Transmission System, from Taleghan’s Dam to Hashtgerd New City, Tehran, Iran ![]() ![]() (1994) Least Cost Path in GIS using Accumulated Cost Surface, and Slopeline.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |